Abstract

Abstract China Railway is undertaking massive construction and development projects. A reasonable and resource-leveled schedule that allows for adjustments for unforeseen circumstances during construction is critical for managing railway construction projects. Currently, most construction projects use traditional network planning methods or the Gantt schedule for project management. However, these methods have limited applicability to railway construction projects, which are typically linear. This study uses the linear scheduling method and constraint programming techniques for solving schedule control problems faced during railroad construction. The proposal comprises a schedule control model, scheduling model, and schedule control system; the scheduling model is central to the schedule control model. Characteristics such as high flexibility and practicality facilitate multi-objective optimization during scheduling and modification of the linear schedule. The proposed model and algorithm were validated by comparing results with actual data from a highway construction project and the Urumqi–Dzungaria railway construction project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.