Abstract
AbstractThis paper develops a model of control over a job sequence which drifts off schedule as the result of random variations in job processing times. Schedule integrity can be partially restored at extra cost by expediting jobs or halting production. The schedule deviation process is modelled as a Wiener process. Expediting production corresponds to a continually acting control on the process’ drift, while halting production corresponds either to an impulsive control or a non-stochastic drift control, depending on how the controller monitors the system. A complete solution to the average cost optimal policy is obtained for a class of cost functions in the impulsive representation of the problem. This is used to construct a partial solution to the problem in the more difficult mixed stochastic-deterministic representation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: INFOR: Information Systems and Operational Research
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.