Abstract

The traditional mine planning framework employs a flawed approach in the design of ultimate pit limits and phases. Conventional methods arbitrarily confine the mine’s extraction schedule during the initial stages, detracting from its optimality before it is created. This work aims to provide a method by which a mine’s phase design is created from an optimal extraction schedule. The schedule-based approach to phase design yields implementable mining phases that mimic the initial raw optimal schedule from which it is based. An attempt to minimise the trade-off between mineability and value is inherent to the approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.