Abstract
This study focuses on the remaining work at stations (STA) 53+950 to 54+550 in Jakarta – CikampekII Selatan Toll Road Package III project to find the critical path, completion durations, and projectcosts before and after acceleration. The CPM Technique was used to compile network planningdiagrams, determine the critical path and project duration. Crashing Project was applied to crashschedule through the total project duration and cost whose changes due to the implementation of thecrashing method. The critical path was found in mobilization, tree felling, clearing, dig and haul,borrow material, subgrade preparation, base course (A grade), subbase course (B grade), drainagelayer, lean concrete (t=10 cm), concrete pavement, concrete barrier type B, and signage. In the CPM,the duration of project completion is 214 days. The total project budget under normal circumstancesis Rp22.073.412.654. After accelerating with the Crashing Project by proposed overtime was obtainedthe reduced total cost of Rp32.004.882 from the total normal cost of Rp22.073.412.654 toRp22.041.407.771 with an optimum duration of 183 days
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Innovation in Enterprise System
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.