Abstract
AbstractThe robustness of construction project schedules is a key factor that determines the capability of the schedules in offsetting the negative impact of uncertainties, which are the primary causes of project delays. This paper proposes a scenario-based proactive robustness optimization (SBPRO) method, which aims to improve the robustness of construction project schedules that are developed using the critical-chain project management (CCPM) method. The SBPRO method integrates scenarios that represent all possible situations that may happen during project implementation. Therefore, schedules are less sensitive to variations of situations than schedules developed using the traditional CCPM-based scheduling method. Moreover, the SBPRO method is based on a dual-objective function and optimizes schedules by balancing a trade-off between two objectives, namely, reducing the length of planned schedules and mitigating the uncertainties in schedule execution. The SBPRO method was validated in three case studie...
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Construction Engineering and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.