Abstract
Scheduling problems of semiconductor manufacturing systems (SMS) with the goal of optimising some classical performance indices (NP-hard), tend to be increasingly complicated due to stochastic uncertainties. This paper targets the robust scheduling problem of an SMS with uncertain processing times. A three-stage multi-objective robust optimisation (MORO) approach is proposed, that can collaboratively optimise the performance indices and their robustness measures. In the first stage, this paper studies the scheduling problem in the deterministic environment and obtains feasible scheduling strategies that perform well in four performance indices (the average cycle time (CT), the on-time delivery rate (ODR), the throughput (TP), and the total movement amount of wafers (MOV)). Then, in the second stage, the uncertainties are introduced into the production system. In the third stage, this paper proposes a hybrid method consisting of scenario planning, discrete simulation, and multi-objective optimisation to obtain an approximately and more robust optimal solution from the feasible scheduling strategy set. The proposed MORO approach is tested in a semiconductor experiment production line and makes a full analysis to illustrate the effectiveness of our method. The results show that our MORO is superior concerning the total robustness with multi-objective.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Similar Papers
More From: International Journal of Production Research
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.