Abstract

Considering the imprecise nature of the data in real-world problems, the earliness/tardiness (E/T) flowshop scheduling problem with uncertain processing time and distinct due windows is concerned in this paper. A fuzzy scheduling model is established and then transformed into a deterministic one by employing the method of maximizing the membership function of middle value. Moreover, an effective scatter search based particle swarm optimization (SSPSO) algorithm is proposed to minimize the sum of total earliness and tardiness penalties. The proposed SSPSO algorithm incorporates the scatter search (SS) algorithm into the frame of particle swarm optimization (PSO) algorithm and gives full play to their characteristics of fast convergence and high diversity. Besides, a differential evolution (DE) scheme is used to generate solutions in the SS. In addition, the dynamic update strategy and critical conditions are adopted to improve the performance of SSPSO. The simulation results indicate the superiority of SSPSO in terms of effectiveness and efficiency.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call