Abstract

Abstract The CO2 Technology Centre Mongstad (TCM) is the world's largest facility for testing and improving technologies for post-combustion CO2 capture. The knowledge gained will prepare the ground for full scale CO2 capture initiatives to combat climate change. TCM is a joint venture between the Gassnova, Statoil, Shell and Sasol. It is located at the West coast of Norway, north of the city Bergen. This paper will discuss the scale-up and transient operation of amine based post-combustion CO2 capture plants in general, and presents some typical results. Scale-up and transient operation are typically among the last topics to be assessed in the technology development process because it requires bigger plants. Results were used from the monoethanolamine (MEA) campaign that was executed in fall/winter 2013/2014. The discussion on scale-up showed that emissions to air, material choice, construction method, vapour/liquid distribution and reclaiming are important technical aspects. Normalized transient data were presented for 7 important variables during a controlled plant stop-and-restart and a sudden stop-fast restart case. Stable CO2 product flow could be obtained after 3–4 hours, while stable emissions and CO2 product temperature took 1–2 hours more. NH3 emissions showed a peak after restart due to accumulation in the solvent during the stop. It was concluded that amine based CO2 capture plants should be able to follow their power plants without significant additional CO2 emissions.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call