Abstract

Time domain power grid simulations provide accurate estimations of power supply noises for design verifications. Despite extensive researches, it remains a very challenging problem to perform the simulations efficiently -- the large power grid sizes demand tremendous computational resources and the causality between consecutive time steps hinders parallel implementations. Frequency domain and model order reduction (MOR) techniques promise scalability, though the solution accuracy may become a concern without trading off running time. In this paper, we present a framework for power grid transient analysis where time domain simulations are assisted by MOR techniques for scalability without losing much of the solution accuracy. Utilizing a direct sparse matrix solver and the multinode moment matching technique, we are able to achieve more than 5X speed-up using 16 processor cores distributed over two servers when simulating 1000 time steps for all the six IBM power grid simulation benchmarks, in comparison to the time domain simulations using only the direct solver.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.