Abstract
ABSTRACT Oil and gas production has been underway in Exxon's Hondo Field since April 1981. The field is being developed using a 945-foot drilling and production platform, the Hondo Platform, and an offshore storage and treating vessel, the Exxon Santa Ynez. The dedicated 50,000 dwt vessel is moored to a single anchor leg type production riser which provides the connection to the three subsea pipelines and a power cable from the Hondo Platform. This paper presents the installation techniques used to install the Single Anchor Leg Mooring.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.