Abstract

ABSTRACT Oil and gas production has been underway in Exxon's Hondo Field since April 1981. The field is being developed using a 945-foot drilling and production platform, the Hondo Platform, and an offshore storage and treating vessel, the Exxon Santa Ynez. The dedicated 50,000 dwt vessel is moored to a single anchor leg type production riser which provides the connection to the three subsea pipelines and a power cable from the Hondo Platform. This paper presents the installation techniques used to install the Single Anchor Leg Mooring.