Abstract

This paper analyzes the effects of the 9-min pan-India voluntary lights-off policy that was planned and executed by the Government of India in April 2020 on the National Grid and the steps that were taken to maintain grid stability during the event. The policy was a symbolic gesture of public solidarity with frontline healthcare and emergency workers in the nation's war against the COVID-19 pandemic. The event entailed nationwide switching-off of electric lights and lighting of earthen lamps or switching-on of torch lights. This 9-min event posed a significant challenge to the country's power systems engineers in managing grid stability during the large-scale load reduction, and meticulous planning and implementation of protective measures were carried out. In this article, the strategy implemented by the Indian power sector to manage the grid during the nine-minute event is described. The variations of grid parameters such as frequency, voltage, and load at all dispatch centers before, during, and after the nine-minutes are analyzed, and the generation schedule that was followed is also presented, along with real-time results. This case study provides an overview of power systems management that involves strategic scheduling of generators throughout the country to tackle sudden and mass-reductions of load on the power system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.