Abstract
AbstractDelivery date setting (DDS) is a challenging and competitively critical tactical decision in engineer-to-order (ETO) environments, which requires integrated planning for effective decision-making. Despite the variety of industrial contexts in DDS literature, the maritime equipment industry has been an unexplored context vis-à-vis planning needs for effective DDS. This study uses a sales and operations planning (S&OP) framework to investigate the current state of the DDS process of two maritime equipment suppliers. Findings indicate that the low market demand over the last few years has influenced the DDS process design in the companies, suggesting that the process should be reconfigured to remain effective under periods of high demand. More cases from the maritime equipment industry are needed to assess if the findings are valid across the industry. KeywordsTactical sales and operations planningDelivery date settingEngineer-to-order
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.