Abstract

Distribution system reliability assessment is an important part of distribution system operation and planning. This paper presents some approaches taken to minimize the SAIDI (System Average Interruption Duration Index) for a remote distribution feeder in an 1 lkV distribution system. Resulting from unavailability of alternative backup supplies from the other adjacent feeders, distributed generators (DG) can be used as backup supplies in this case. Coordinating distribution automation (DA) system with DG, the restoration area can be made larger and the outage time can be shorter, consequently, the distribution system reliability can be improved significantly. In this paper, factors affecting SAIDI are discussed and methods including feeder reconfiguration, recloser installation and replacement and DG installation are applied to minimize SAIDI. Comparative studies are performed and related results are addressed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.