Abstract

Problem: Accidents involving temporary access systems, particularly temporary scaffolds, account for a large proportion of injuries in the construction industry worldwide. Method: This paper outlines the development of a prototype decision aid (SCAFPASS, an abbreviation for Scaffold Planning Aid for System Safety) to promote access scaffold safety. It was guided by an examination of the root-causes and management deficiencies apparent in: (a) paper-based files of 186 access-related incidents held by the Health and Safety Executive (HSE) in the UK; and (b) computer-based files of 2,910 incidents appearing in the HSE database between 1997 to 2000. Results: The more frequent root-causes included the fitting of defective components, unauthorized modification of the structure, omission of barriers, and errors resulting in simple, readily detectable structural faults. Common managerial deficiencies included failure to control risk, unsafe methods and procedures, and inadequate training and supervision. Impact on Industry: SCAFPASS aims to avoid these root-causes by improving safety management from the outset and throughout all phases of a project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.