Abstract
Safety stock planning that focuses on risk protection to cope with demand uncertainties is a very well researched topic in the field of supply chain management, in central as well as in local decision making systems. In contrast, there is only few knowledge about safety stock management in situations where supply risks have to be covered that are caused by uncertainties with respect to production yields. In this study, a two-stage manufacturer-retailer supply chain is considered in a single-period context that allows for an analytical study of the impact of yield randomness on safety stock determination. In order to concentrate the analysis on the effects of yield uncertainty demand will be assumed to be deterministic.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.