Abstract

The management of requirement (purchased parts and components) uncertainty in MRP systems is a serious problem for manufacturing firms. When manufacturing service levels fall below a predetermined service level, safety stock must be increased in order to adjust to the competitive environment. This paper presents the results of a set of simulation experiments in which we investigate some of the complexities of safety stock requirements, lot sizing performance and the marginal safety stock requirements associated with various service level policies. The results of the experiments have empirically shown that the marginal units of safety stock required for various service level policies follow a predictable (measurable) pattern. The research also indicates that the economic advantages of well-known dynamic lot sizing procedures are diminished by the presence of requirements uncertainty. Another important finding is the interaction between service level and ‘lumpy’ requirements. High levels of the coefficient of variation and the economic time between orders resulted in larger orders, reduced safety stock and high service levels. In general, the overall findings from this research will hopefully provide the decision maker with an in-depth understanding of the measurement and impact of various service level policies.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.