Abstract

With the rapid development of urban and social economies, the safety accidents in the construction process of the new chemical plant have caused huge losses to the city. The purpose of this study is to evaluate the risks in the construction process of chemical projects and propose preventive measures. A novel risk assessment model based on multi-intelligence algorithm optimization projection pursuit was developed to assess the construction safety risk and determine the risk level. In this model, the best-worst method and the entropy weight method were used as subjective and objective evaluation methods, respectively. The theory based on the idea of the distance function was applied to the model to calculate the combined weight value. The results showed that the three evaluation objects with the highest risk value were the air compression station plant, regional control room, and hazardous and solid waste temporary repository. The risk values of these three buildings were 2.2557, 2.2160, and 2.1654, respectively, and the corresponding risk level was high. On-site safety managers should take immediate measures in these high-risk buildings to reduce the possibility of accidents. This study is a new attempt to consider the construction safety risk of the new chemical project.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.