Abstract

The operation control system (OCS) is the main means to improve the observability and controllability of the virtual power plant (VPP). The risk assessment and control of VPP-OCS is the main aspect of the comprehensive safety risk management of the enterprise. Based on the perspective of COBIT 5 for risk, using its method and framework, this paper designs and implements the risk management and control process of VPP-OCS. In the implementation process, the identification of important assets, risk identification and disposal are carried out, and finally the risk control measures are listed. The research of this paper will play an important role in promoting the construction of safety production risk management system of VPP.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.