Abstract

Problem Construction risk management is challenging. Method We combined data on injuries, costs, and hours worked, obtained through a Rolling Owner-Controlled Insurance Program (ROCIP), with data from focus groups, interviews, and field observations, to prospectively study injuries and hazard control on a large university construction project. Results Lost-time injury rates (1.0/200,000 hours worked) were considerably lower than reported for the industry, and there were no serious falls from height. Safety was considered in the awarding of contracts and project timeline development; hazard management was iterative. A top-down management commitment to safety was clearly communicated to, and embraced by, workers throughout the site. Discussion and Impact A better understanding of how contracting relationships, workers' compensation, and liability insurance arrangements influence safety could shift risk management efforts from worker behaviors to a broader focus on how these programs and relationships affect incentives and disincentives for workplace safety and health.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.