Abstract

By appearing more complex projects, Design–Bid-Build (DBB) contracts could not satisfy new projects requirements and a need to new types of contracts was felt. New contracts requirements differ from previous ones. Challenging the method of proposal offering in design–construct contracts, this paper seeks solutions for more rational proposing of project uncertainties. The problem commences with the question “which duration and price a contractor must propose in a project with design–construct contract?” A part of the answer to this question is the matter of the lowest-risk limit of uncertainties which result from output of Monte Carlo Simulation and its analysis. The output of this analysis is a series of intervals named “safety Intervals” which will be contractors’ guide in offering the bid proposal.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.