Abstract

With the growing demand for transportation, there has been a significant increase in road-related projects, leading to potential risks in the safety of existing structures. This paper presents a study on the influence of new tunnel construction on the stability of an adjacent existing tunnel and provides valuable insights for the safety technology evaluation of similar tunnel crossing projects. In order to evaluate the influence of tunnel excavation on adjacent tunnels, the excavation process of a new tunnel near the original tunnel is simulated using the finite element software Midas GTS. This analysis includes the evaluation of static and dynamic responses. The results indicate that the horizontal and vertical displacements caused by the excavation of the railway tunnel are minimal. Furthermore, during the blasting excavation of the railway tunnel, the vibration velocity experienced by the highway tunnel remains below the safe allowable limit. These findings demonstrate that in this project, the influence of blasting excavation for the railway tunnel on the highway tunnel is both safe and manageable.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.