Abstract

In order to assess the safety of a buried DN1200 water supply pipeline under blasting vibration induced by subway tunnel excavation, we established a 3D numerical model of the real field engineering based on the Ling-Qing section of Tsingtao Metro Line 3. According to the field blasting monitoring test of ground surface, the reliability of the numerical model and the parameters is proved. Then, the dynamic response of the pipeline in empty state under the blasting vibration is discussed. Meanwhile, the crack strength of reinforced concrete pipe is determined based on the fracture mechanics theory. Based on the analysis, the safety of the empty pipeline under the blasting vibration is assessed. Next, we further assessed the safety of pipeline in the state of full-filled water without pressure and full-filled water with 0.2 MPa pressure (the normal working state). The results indicate that the upper water pipeline in the three states is safe under the blasting vibration induced by subway tunnel excavation with adopted parallel cut blasting method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.