Abstract

The paper presents the methodology adopted to assess the Interim Safety Analysis Report (ISAR) of the Belene NPP in the framework of the contract between the Bulgarian Nuclear Regulatory Authority (BNRA) and RISKAUDIT (IRSN&GRS). It stresses the in-depth analysis carried-out for several relevant-to-safety issues and illustrates in some detail the investigation of the Large Break Loss of Coolant Accident (LB LOCA) with loss of power and failure of the active part of the Emergency Core Cooling System (High Pressure and Low Pressure Safety Injection pumps), performed with the French best estimate thermal-hydraulic code CATHARE. The role, problems and efficiency of the passive and active safety systems during the accident scenarios are discussed. Finally, the main conclusions of the safety evaluation of the Belene NPP project are summarized.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.