Abstract
Based on the engineering that shield machine’s passing through a vertical shaft in urban rail transit construction, two methods are proposed according to the engineering geology and construction organization and finite element model is established to simulate the real situation. After the technical analysis and safety analysis of the two methods, the recommended method is given, also given are the corresponding safety measures and construction procedure. The success of this engineering proves that this analysis is reasonable and the safety measures are worth of referring to.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.