Abstract

This document contains the completed safety analysis which establishes the safety envelope for performing the mixer pump process test in Tank 241-AZ-101. This process test is described in TF-210-OTP-001. All equipment necessary for the mixer pump test has been installed by Project W-151. The purpose of this document is to describe and analyze the mixer pump test for Aging Waste Facility (AWF) Tank 241-AZ-101 and to address the 'yes/maybe' responses marked for evaluation questions identified in Unreviewed Safety Question Evaluation (USQE) TF-94-0266. The scope of this document is limited to the performance of the mixer pump test for Tank 241-AZ-101. Unreviewed Safety Question Determination (USQD) TF-96-0018 verified that the installation of two mixer pumps into Tank 241-AZ-101 was within the current Tank Waste Remediation System (TWRS) Authorization Basis. USQDs TF-96-0461, TF-96-0448, and TF-96-0805 verified that the installation of the in-tank video camera, thermocouples, and Ultrasonic Interface Level Analyzer (URSILLA), respectively, were within the current TWRS Authorization Basis. USQD TF-96-1041 verified that the checkout testing of the installed equipment was within the current TWRS Authorization Basis. Installation of the pumps and equipment has been completed. An evaluation of safety considerations associated with operation of the mixer pumps for the mixer pumpmore » test is provided in this document. This document augments the existing AWF authorization basis as defined in the Interim Safety Basis (Stahl 1997), and as such, will use the existing Interim Operational Safety Requirements (IOSRs) of Heubach 1996 to adequately control the mixer pump test. The hazard and accident analysis is limited to the scope and impact of the mixer pump test, and therefore does not address hazards already addressed by the current AWF authorization basis. This document does not evaluate removal of the mixer pumps. Safety considerations for removal of the pumps will be addressed by separate safety documentation once that portion of the mission is defined. The mixer pump test has been evaluated to cover the use of either the existing ventilation system (241-A-702) or the ventilation system upgrade provided by Project W-030. Analysis of Project W-030 is outside of the scope of this document and is addressed in HNF-SD-WM-SARR-039 (Draft) which, should the W-030 system be in service at the time of the mixer pump test, will have been approved and made a part of the TWRS authorization basis. The test will use two high-capacity mixer pumps in various configurations and modes to demonstrate solids mobilization of waste in Tank 241-AZ-101. The information and experience gained during the test will provide data for comparison with sludge mobilization prediction models; provide data to estimate the number, location, and cycle times of the mixer pumps; and provide indication of the effects of mixer pump operation on the AWF tank systems and components. The slurry produced will be evaluated for future pretreatment processing. This process test does not transfer waste from the tank; the waste is mixed and confined within the existing system. At the completion of the mixer pump test, the mixer pumps will be stopped and normal tank operations, maintenance, and surveillance will continue. Periodic rotation of the mixer pumps and motor shafts, along with bearing greasing, is required to maintain the pumps following the mixer pump test.« less

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.