Abstract
PURPOSES : This paper presents how to determine priorities of RWIS installation on national highways within the limited budget. METHODS : Analytical hierarchy process was employed to develop the entire methodology. In addition to this, various data such as vulnerable roadway section for snow removal, RWIS, AWS, AADT, and traffic accident were properly collected and analyzed for the future analysis. Then, GIS analysis was performed to find out the final candidate vulnerable roadway section for snow removal. In the end, expert survey was conducted to estimate weights for evaluation criteria. RESULTS : Results showed that metropolitan area has the most high priority, and Gangwon area, ChungCheung, and Honam in order. CONCLUSIONS : The main contribution of this paper is to suggest a logical methodology to prioritize RWIS installation within the limited budget, and thus snow removal operation during the winter season can improve in terms of getting more valuable information.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.