Abstract
A key tool to increase the exploitation of dynamic reconfigurable platforms is the run-time resource manager. This system module coordinates the usage of both software and reconfigurable hardware resources in the context of a multi-programmed environment, by alleviating the operating system's induced overhead. This paper introduces a two-layers run-time resource manager for dynamic reconfigurable platforms. The upper level is composed of several application-level managers (one for each application) that provide the most suitable mapping based on resource constraints and performance prediction. The lower level is composed of a centralized system-level resource manager that assigns the HW/SW resources to each application. We present a video surveillance case study in which the proposed resource management technique outperforms the performance of the state of the art by 28% on average, introducing a computational time overhead within 2%.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.