Abstract

Coefficient of variation (CV) is an important quality characteristic to take into account when the process mean and standard deviation are not constants. A setback of the existing chart for monitoring the multivariate CV is that the chart is slow in detecting a multivariate CV shift in the Phase-II process. To overcome this problem, this paper proposes a run sum chart for monitoring the multivariate CV in the Phase-II process. The average run length (ARL), standard deviation of the run length (SDRL) and expected average run length (EARL), under the zero state and steady state cases, are used to compare the performance of the proposed chart with the existing multivariate CV chart. The proposed chart’s optimal parameters are computed using the Mathematica programs, based on the Markov chain model. Two one-sided run sum charts for monitoring the multivariate CV are considered, where they can be used simultaneously to detect increasing and decreasing multivariate CV shifts. The effects of different in-control CV values, number of regions, shift and sample sizes, and number of variables being monitored are studied. The implementation of the proposed chart is illustrated with an example using the data dealing with steel sleeve inside diameters.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.