Abstract

Exponentially weighted moving average (EWMA) control charts are well-established devices for monitoring process stability. Typically, control charts are evaluated by considering their Average Run Length (ARL), that is the expected number of observations or samples until the chart signals. Because of the limitations of an average, various papers also dealt with the run length distribution and quantiles. Going beyond these papers, we develop algorithms for and evaluate the quantile performance of EWMA control charts with variance adjusted control limits and with fast initial response features, of EWMA charts based on the sample variance, and of EWMA charts simultaneously monitoring mean and variance. Additionally, for the mean charts we consider medium, late and very late process changes and their impact on appropriately conditioned run length quantiles. It is demonstrated that considering run length quantiles can protect from constructing distorted EWMA designs while optimising their zero-state ARL performance. The implementation of all the considered measures in the R package ‘spc’ allows any control chart user to consider EWMA schemes from the run length quantile prospective in an easy way.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call