Abstract

Wafer fabrication is a capital-intensive and highly complex manufacturing process. In the wafer fabrication facility (fab), wafers are grouped as a lot to go through repeated sequences of operations to build circuitry. Lot scheduling is an important task for manufacturers to improve production efficiency and meet customers’ requirements of on-time delivery. In this research we propose a dispatching rule for lot scheduling in wafer fabs, focusing on three due date-based objectives: on-time delivery rate, mean tardiness, and maximum tardiness. Although many dispatching rules have been proposed in the literature, they usually perform well in some objectives and bad in others. Our rule implements good principles in existing rules by means of (1) an urgency function for a single lot, (2) a priority index function considering total urgency of multiple waiting lots, (3) a due date extension procedure for dealing with tardy lots, and (4) a lot filtering procedure for selecting urgent lots. Simulation experiments are conducted using nine data sets of fabs. Six scenarios formed by two levels of load and three levels of due date tightness are tested for each fab. Performance verification of the proposed rule is achieved by comparing with nine benchmark rules. The experimental results show that the proposed rule outperforms the benchmark rules in terms of all concerned objective functions.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.