Abstract

Original scientific paper Production scheduling plays a vital role in the planning and operation of a manufacturing system. Better scheduling system has a significant impact on cost reduction and minimum work-in-process inventory. This work considers the problem of scheduling n/m/F/ΣCi using Decision Tree (DT) algorithm. Since this problem is known to be strongly NP-hard, this work proposes heuristic based methodology to solve it. The advantages of DT’s are that the dispatching rule is in the form of If-then else rules which are easily understandable by the shop floor people. The proposed approach is tested on benchmark problems available in the literature and compared. The proposed work is a complement to the traditional methods.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.