Abstract

Aim of this study was to re-schedule flights between Mumbai and Delhi for eleven schedules to reduce the rest periods for crew members when they stay at Mumbai and Delhi; which results in improving the utility of the resources to a greater extent. The problem was formulated as an assignment problem with eleven schedules from Mumbai to Delhi and back. Hungarian Method was used to solve the problem using OR software. Results reveals that by re-scheduling flights between Mumbai and Delhi rest period for the crew was reduced considerably about 32%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.