Abstract

From a quite general form of the Lindblad-like master equation of open two-level systems (qubits), we study the effect of Lamb shift on the non-Markovian dynamics. We find that the Lamb shift can induce a non-uniform rotation of the Bloch sphere, but that it does not affect the non-Markovianity of the open system dynamics. We determine the optimal initial-state pairs that maximize the backflow of information for the considered master equation and find an interesting phenomenon–the sudden change of the non-Markovianity. We relate the dynamics to the evolution of the Bloch sphere to help us comprehend the obtained results.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.