Abstract
AbstractDespite their negative impact on the construction industry, cost overruns have become an almost natural part of building and infrastructure projects. This paper examines the phenomenon as a worldwide problem, identifies its root causes, ranks them (on a local basis), and analyses them. Root-cause analysis is not merely an arbitrary expression; rather, it is a systematic, formal, well-structured methodology, used as part of the total quality-management approach. The expand–focus principles and techniques were applied in this research for assembling an initial, as wide as possible, inclusive list (pool) of 146 potential causes gathered from the international professional literature as well as from prominent local experts. Through two cycles of expand–focus, they were filtered and merged into merely 15 independent universal root causes. These were further investigated through a cross-sectional survey among 200 local construction practitioners who ranked the 15 universal root causes according to their...
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Construction Engineering and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.