Abstract

Dynamic transmission network expansion planning (DTNEP) decides when (which year) and where (which R.O.W.), the new lines are to be built so that the overall cost of the plan is minimum and the system is secure. Generally, this is done for a fixed time horizon window (3/5 years) at a time. DTNEP has been proved to be better than the incremental approach in which optimal investment plans are found out for each year separately. In DTNEP, 1st year and last/terminal years are given different treatment, and there is a complete disconnect between two DTNEP windows. Also DTNEP assumes that the conditions during optimization like the earlier year generation, transmission expansion plans get\ executed exactly as per plan &/or the load forecast for the entire period remains unchanged. However, it is well known that this is generally not true. In view of above, this paper presents a rolling window based approach which treats every year of investment in exactly the same fashion. It also has an inherent capability to take care of such changes. It involves successive, overlapping DTNEP for 3/5 years planning horizon. A harmony search algorithm is used for the solution of the problem. Results for two test systems have been obtained to demonstrate the potential of the algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.