Abstract

AbstractWhen estimating the duration of the construction stage during the design stages of construction projects, empirical models are often used as a substitute for more accurate estimates based on detailed scheduling. These models, traditionally designated as time-cost relationships (TCR), derive from regressions relating the duration of concluded construction projects with characteristics that can be easily foreseen during the planning and design stages—both quantitative (e.g., cost, gross floor area, number of floors) and qualitative (e.g., type of contract). This paper reviews the approaches that have been adopted to develop the TCR models and discusses the complementary roles that statistics and engineering judgment can play towards their optimization and enhanced accuracy. This discussion includes the statistical and practical implications of (1) the quantitative independent variables used, (2) the qualitative independent variables used, and (3) the mathematical structure used. The paper aims at de...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.