Abstract
Pilot-scale experiments were performed to investigate the role of equalization basins used with constructed wetland systems for treatment of flue gas desulfurization (FGD) waters. Analysis of FGD water samples indicated that aqueous concentrations of Hg, As, and Se remained constant or changed very slightly in a pilot-scale equalization basin during a 24-h hydraulic retention time (HRT). No change in toxicity of FGD water occurred after one HRT. FGD particles were predominantly silt size, and approximately 99% of particles suspended in FGD water settled to the bottom of a 2.5-m-deep equalization basin during the first 4 h of the 24-h HRT. Approximately 90% of the total As, and smaller percentages of Hg and Se, in FGD water and particles were removed by particle settling in the equalization basin. Results of this investigation lend support to the use of equalization basins for treating FGD waters in constructed wetland treatment systems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.