Abstract
Construction industry being an excellent example of supply chain has various key components which are interlinked and interdependent on each other. The whole chain is glued on communication among each other. Any lack in the flawlessness of this communication breaks the chain and the whole system gets affected. The work breakdown structure of this industry is structured in a hierarchical manner and works on decentralization of the authority. The most common lack of communication has been observed between the Contractor and Sub-contractors which causes multiple issues during delivery. Thus, this study has established a workflow through which BIM (Building Information Modelling) can be employed to improve communication between the Contractor and Sub-contractor of a project. This document gives formatting instructions for authors preparing papers for publication in the Proceedings of an IEEE conference. The authors must follow the instructions given in the document for the papers to be published. You can use this document as both an instruction set and as a template into which you can type your own text.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal for Research in Applied Science and Engineering Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.