Abstract

This Engineering geology research on rock mass classification to determine the support system’s design and stand-up time at the Asahan 3 hydroelectric tunnel STA 7+085 – STA 7+717 has not been thoroughly carried out in detail. This study aims to estimate the support requirements. Rock mass classification is determined through core drill observations and then analyzed by Q-system and RMR methods. The results show that the rock mass at the tunnel depth elevation consists of sandstone with good quality based on RMR and Q-system. Based on the Q system classification, good quality sandstone is obtained. Based on RMR, the suggested support system is shotcrete in the crown and rockbolt. Meanwhile, a rock bolt is the appropriate support system based on the Q-system. The use of an RMR based support system is recommended because it provides a higher level of security with the addition of shotcrete. The tunnel stand-up time is 2,200 - 2,700 hours based on RMR. The result of this research is expected to be applied in other tunnel construction having similar engineering geological condition.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.