Abstract

When water resource systems investments are made there is little assurance that the predicted performance will coincide with the actual performance. Robustness is proposed as a measure of the likelihood that the actual cost of a proposed project will not exceed some fraction of the minimum possible cost of a system designed for the actual conditions that occur in the future. The robustness criterion is illustrated by its application to the planning of water supply systems in southwestern Sweden.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.