Abstract

Scheduling problems occur in many economic fields such as manufacturing, logistics, management, computer sciences, and so on … This paper studies the solutions suggested for the flexibility and robustness of a manufacturing scheduling problem - known in literature as the Cyclic Hoist Scheduling Problem (CHSP). Electroplating lines is a branch stemming from this class of problems where automatic hoist is used for moving electroplates through chemical baths. After a brief state of the art and a problem description, an example is adopted for the study of the robustness of a solution for a two-degree cyclic scheduling problem. Then, the flexibility of the solutions and their impact on the cycle time is presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.