Abstract

While the study of reverse wood value chains has become an important topic recently, optimization-focused studies usually consider network-level problems and decisions, and do not address the individual processes in the network. In the case of waste wood, one such important process is the scheduling of the various machines in a waste wood processing facility to treat incoming wood deliveries with multiple sources and varying quality. This paper proposes a robust multi-objective mixed-integer linear programming model for the optimization of this process that considers the uncertain origins and compositions of the incoming deliveries, while aiming to minimize both lateness and energy consumption. An exhaustive study is performed on instance sets of different sizes and structures to show the efficiency and the limits of the proposed model both in single- and multi-objective cases.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.