Abstract

Matrix-structured production systems are becoming increasingly appealing for realizing an individualized mass production. An appropriate method for scheduling in such systems under consideration of machine disturbances is necessary due to the increased complexity and degrees of freedom in order to achieve a high and stable performance. A robust predictive–reactive method for scheduling is proposed and the relationship between increased robustness in predictive scheduling and the ability to reschedule is analyzed in this paper. The result will enhance understanding of the utility of robust scheduling methods in order to maintain high logistic performance even when facing machine disturbances.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.