Abstract

We address a project scheduling problem with resource availability cost for which the activity durations are uncertain. The problem is formulated within the robust optimization framework, where uncertainty is modeled via a set of scenarios. The proposed solution method is based on the scatter search methodology and employs advanced strategies, such as dynamic updating of the reference set, a frequency-based memory mechanism, and path relinking. A multistart heuristic was also developed and comparative results are reported. The tradeoffs for risk-averse decision makers are discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.