Abstract

In the restructured electricity market, operator of grid-connected microgrid (MG) tries to supply local load at the lowest cost from alternative energy sources including upstream grid, gas-turbines as local dispatchable units and renewable energy sources (photovoltaic systems and wind-turbines) as well as charge/discharge of energy storage system. In order to purchase power from upstream grid, the bidding curve of MG should be prepared to bid to the market operator. Therefore, this study proposes a robust optimisation approach (ROA) for obtaining optimal bidding strategy of MG. Also, MG operator uses time-of-use rate of demand response program (DRP) to reduce procurement energy cost. For this purpose, ROA is used for uncertainty modelling of upstream grid prices in which the minimum and maximum limits of prices are considered for the uncertainty modelling. The lower and upper bounds of price are consecutively subdivided into sequentially nested subintervals which allow formulating robust mixed-integer linear programming problems. The bidding strategy curves of MG for each time considering DRP are obtained from sufficient data by solving these problems. To show the capability of proposed approach, two cases are studied.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.