Abstract
Energy storage system (ESS) management benefits the operation of all-electric ships (AESs) since its ability to balance the generation and demand. However, current works rarely consider the influence of navigation uncertainties, i.e., uncertain water waves and winds, and fail to address two characteristics of shipboard ESS, i.e., redundant capacity and distributed locations. In this paper, a two-stage robust optimal shipboard microgrid operation method is proposed to mitigate the pre-voyage and intra-voyage navigation uncertainties. The first stage is to regulate the onboard generation and voyage variables for addressing the worst pre-voyage navigation uncertainties and the second stage is an on-line recourse action which acts on intra-voyage uncertainty realization. To address the characteristics of shipboard ESS, the onboard batteries are separated into two groups and a multi-battery management strategy is proposed for the battery lifetime extension. An AES with 4 DGs and 4 batteries is used in the case studies. The simulation results show that the proposed method can well adapt to the navigation uncertainties and the multi-battery management can extend the battery lifetime by iteratively using different battery groups.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.