Abstract

This paper considers group scheduling problem in hybrid flexible flow shop with sequence-dependent setup times to minimize makespan. Group scheduling problem consists of two levels, namely scheduling of groups and jobs within each group. In order to solve problems with this context, two new metaheuristics based on simulated annealing (SA) and genetic algorithm (GA) are developed. A design procedure is developed to specify and adjust significant parameters for SA- and GA-based metaheuristics. The proposed procedure is based on the response surface methodology and two types of objective function are considered to develop multiple-objective decision making model. For comparing metaheuristics, makespan and elapsed time to obtain it are considered as two response variables representing effectiveness and efficiency of algorithms. Based on obtained results in the aspect of makespan, GA-based metaheuristic is recommended for solving group scheduling problems in hybrid flexible flow shop in all sizes and for elapsed time SA-based metaheuristic has better results.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.