Abstract

In this paper, we deal with the problem of tactical capacitated production planning with the demand under uncertainty modelled by closed intervals. We propose a single-item with backordering model under small uncertainty in the cumulative demand for the Master Production Scheduling (MPS) problem with different rules, namely the Lot For Lot rule and the Periodic Order Quantity rule. Then we study a general multilevel, multi-item, multi-resource model with backordering and the external demand on components for the Material Requirement Planning (MRP) problem under uncertainty in the cumulative demand. In order to choose robust production plans for the above problems that hedge against uncertainty, we adopt the well-known minmax criterion. We propose polynomial methods for evaluating the impact of uncertainty on a given production plan in terms of its cost and for computing optimal robust production plans for both problems (MPS/MRP) under the assumed interval uncertainty representation. We show in this way that the robust problems (MPS/MRP) under this uncertainty representation are not much computationally harder than their deterministic counterparts.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.