Abstract

Strategic planning in mining is an important value accretive process. One of the most essential aspects during the planning phase is determining the correct system design. A traditional mine design process develops a fixed system for one set of conditions or expected values. An alternative is to develop a robust system that deals with variation, by handling a range of conditions within the optimisation process. Conversely, a flexible design can be generated which changes the system dynamically over time in response to change. It is hypothesised that a flexible design generates more value than a robust design which in turn generates more value than a traditional design. However, due to constant change, a fully flexible design is not practical. Ideally, a hybrid of the two methods would be optimal. An operational design is proposed as a manual solution to this problem. This paper compares these different new design methodologies.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.