Abstract

Occurring disruptions and faults violate the perfectness of a production process in determining Economic Production Quantity (EPQ). Integrating EPQ, Statistical Process Control (SPC), and maintenance terms has brought satisfactory outcomes for such an imperfect process. Under the violated independence assumption, the Autoregressive Moving Average (ARMA) chart has been applied in the integrated models. Under autocorrelation, the extended Acceptance control chart (ACC) has indicated significant reductions in costs. Nevertheless, it has not been applied to any integrated modeling yet. Until now, constant input factors have been considered for modeling imperfect and autocorrelated processes. Uncertainty in estimating those factors can deteriorate the effectiveness of models. We present the first robust design for imperfect and autocorrelated processes under uncertainty. We apply a particle swarm optimization algorithm to provide solutions. The investigations of simple and integrated modeling indicate that applying the ACCs causes better statistical and economic results. Also, a real-life application is presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.